OUR CASE STUDIES

ENGCONOMICS

SHOWCASE:

ROLL OVER PROTECTION STRUCTURE (ROPS)

2024

KEY CHALLENGE

Personnel safety while driving an LDV

PROJECT OBJECTIVE

Produce a lighter solution to the current market

SOLUTION IMPLEMENTED

DESIGN A ROPS THAT IS LIGHT AND COST EFFECTIVE

MANUFACTURING AND DISTRIBUTION

BUSINESS VALUE

Designed a ROPS that weighs 43 kg less than current market products, resulting in lower manufacturing costs

SHOWCASE:

Container Port Terminal performance improvement

2024

KEY CHALLENGE

A complex operational environment with constraints such as equipment downtime, procurement inefficiencies, and inconsistent team participation impacted the overall efficiency and effectiveness of terminal operations.

PROJECT OBJECTIVE

To enhance operational performance within a 100-day period by focusing on specific, measurable objectives. These included improving the availability and reliability of key equipment, streamlining procurement processes, and achieving ambitious movement targets.

SOLUTION IMPLEMENTED

Engconomics utilized the Rapid Results methodology, which empowered front-line teams to implement targeted interventions swiftly. The project involved:

  • Reducing equipment downtime and recovering long-standing equipment issues.
  • Introducing innovative solutions like flexi flippers and redesigned hydraulic fittings on spreaders.
  • Enhancing procurement processes and spares capacity management.
  • Providing ongoing training and development to address skills gaps.
  • Engaging sponsors and stakeholders for enhanced support.
  • Implementing flexible meeting schedules to accommodate shift patterns.

BUSINESS VALUE

The Rapid Results methodology led to significant improvements in operational performance:

  • Reduced downtime for critical equipment such as Spreaders and maintaining stabilized Straddle Carriers availability.
  • Recovered and optimized the use of RTGs.
  • Improved stock level management for fast-moving items.
  • Empowered teams with continuous improvement and adaptation skills.
  • Created a foundation for sustainable gains and future scalability of successful practices.

SHOWCASE:

Underground mining (Vehicle fatigue analysis)

2024

KEY CHALLENGE

Premature failure of Laud Haul Dump (LHD) chassis

PROJECT OBJECTIVE

Determine asset life and optimal maintenance interval

SOLUTION IMPLEMENTED

DESIGN A ROPS THAT IS LIGHT AND COST EFFECTIVE

BUSINESS VALUE

Prevented production losses due to unpredicted failures

SHOWCASE:

Rock winder Skip Redesign

2024

KEY CHALLENGE

Regular rock winder skip failures resulted in failure investigations that revealed various design flaws

PROJECT OBJECTIVE

Reduce maintenance downtime by designing a fatigue enhanced door and eliminate stuck skip door incidents with wet ore loads

SOLUTION IMPLEMENTED

Results

  • Developed new monocoque skip door concept
  • Designed unwelded skip level box using rolling elements bearings
  • Designed locking arm and repositioned it to eliminate the bridle influence
  • New bridle and chute designed to improve twist torque resistance by over 50%
  • Reduced harmonic excitation possibility and provided a lighter stiffer chute

DISCIPLINE AND SOLUTION AGNOSTIC

First principle mechanical engineering design principles followed, and FEA applied to verify

BUSINESS VALUE

Reduced downtime excess of R5 million per day.
Ensured 18 ton per load upgrade target

SHOWCASE:

Railway system asset condition audit

2023

KEY CHALLENGE

Private Public Partnership (PPP) agreement requirement to audit asset condition

PROJECT OBJECTIVE

Determine the condition and risk of Remaining Useful Life (RUL) of the system not achieved

SOLUTION IMPLEMENTED

In conjunction with industry partners Engconomics implemented:

BUSINESS VALUE

Key assets have been identified as at risk of not meeting their required RUL, with recommended actions provided.

SHOWCASE:

MINING PROCESSING

2023

KEY CHALLENGE

  • Inadequate control reduced throughput​
  • Challenge identified while improving equipment reliability

PROJECT OBJECTIVE

  • Leadership alignment and prioritisation of strategic initiatives using a Techno Economic Model/Digital Twin of the plant​
  • Just in time experiential learning​
  • 100 day projects

SOLUTION IMPLEMENTED

DEVELOPED CONTROL ALGORITHMS

BUSINESS VALUE

Reduced equipment downtime by 96%
Sustainable performance improvement through enhanced capacity and capability

SHOWCASE:

platinum smelter production improvement

2023

KEY CHALLENGE

Ageing smelter bottleneck in Platinum production chain

PROJECT OBJECTIVE

Improve production output to a P101 target

SOLUTION IMPLEMENTED

BUSINESS VALUE

Production improvements of up to 5% have been achieved to date

SHOWCASE:

PULP AND PAPER MODELLING

2021

KEY CHALLENGE

Frequent shutdowns due to boiler fouling and evaporator scaling

PROJECT OBJECTIVE

Improve frequent shutdowns due to boiler fouling and evaporator scaling

SOLUTION IMPLEMENTED

DEVELOPED NEW ALGORITHMS

DISCIPLINE AND SOLUTION AGNOSTIC

BUSINESS VALUE

USD11 million net profit improvement per annum

SHOWCASE:

UNDERGROUND PLATINUM MINING

2020

KEY CHALLENGE

Operational sustainability due to financial and market pressures

PROJECT OBJECTIVE

100-day project​
Reduce unit production cost

SOLUTION IMPLEMENTED

MINING

ENGINEERING

BUSINESS VALUE

Improved unit production cost from 4th quartile to 2nd quartile of peer mines

SHOWCASE:

OPEN PIT DIAMOND MINE UNIT COST improvement

2018

KEY CHALLENGE

Production constrained by market, unit cost lagging benchmarks

PROJECT OBJECTIVE

Improve unit cost of production

SOLUTION IMPLEMENTED

BUSINESS VALUE

7% maintenance cost reduction

SHOWCASE:

POWER UTILITY FINANCIAL OUTLOOK

2018

KEY CHALLENGE

Major power utility with under- maintained ageing plant at risk of balance sheet impairment

PROJECT OBJECTIVE

Independent technical audit of major power utility long-term cash generating capability

SOLUTION IMPLEMENTED

TECHNO-ECONOMIC MODEL

BUSINESS VALUE

Balance sheet impairment decision informed